Workflow-Set · Construction & real estate

One variation, one drawing revision, one approval

The flooring area for Building B changes. The site lead approved revision C, while the contractor still holds B. Separate the discussion, the authoritative drawing and the instruction to proceed so nobody orders from a chat message.

Which tool handles which task?

Here is how a team could handle this case. These are proposed roles, not an installed automation. Check the catalog and your own account for available actions and permissions.

  1. Step 01

    Microsoft Teams

    Capture the building and room from the enquiry.

    Example from the tool catalog

    MICROSOFT_TEAMS_CHATS_GET_ALL_MESSAGES

  2. Step 02

    SharePoint

    Record the approved drawing and revision as the source.

    Example from the tool catalog

    SHARE_POINT_SHAREPOINT_CREATE_LIST_ITEM

  3. Step 03

    monday.com

    Assign measurement and variation review separately.

  4. Step 04

    Docusign

    Match the signed document to the reviewed variation reference.

    Example from the tool catalog

    DOCUSIGN_ADD_EXISTING_BRAND_TO_GROUP

  5. Step 05

    Trello

    Place only confirmed instructions and a drawing reference on the delivery board.

When does a person need to decide?

If revisions or quantities differ, return the case to the site lead. A signature for revision B is not evidence that the revised area was accepted.

Acceptance test for your pilot

Supply two identically named PDFs with different revisions. The handover must name the revision, not just the filename.

Selection basis: integration catalog and editorial fit for this case. The data does not establish a representative Swiss popularity ranking.